Call Us: (+966) 12 566 8430

Roads Supervision

Home / Roads Supervision

Description

The nature of the work of the department in providing consultancy services for the Department of Roads honestly holy capital of the following activities <br/>• supervising the implementation of affiliated to the Department of Roads projects depending on the requirements of quality and safety <br/>• Field studies to determine the priorities for projects Taiv <br/>• Design and study methods and schemes with the necessary calculation of quantities and cost estimate <br/>• work and follow-up schedules for projects

Project Manager

Eng. Ehab Moussa

Contracts

Contract Name Contractor Contract No. Contract Value
Improve efficiency and raise the roads The Mrtan 64 28,571,825
Opening and expansion of some of the main roads to decode traffic jams Mautrofi 102 39,579,100
Asphalt pavements grants Mecca schemes (Phase III) Assa'edi 84 19,923,250
Assa'edi asphalt pavements grants schemes in Makkah (Phase III) Etawi 58 12,891,120
Asphalt paving and lighting the streets of Mecca and conservative Aljmom and Usfaan (Phase II) Alzimi 69 34,509,490
Create parking ground scattered sites in Makkah Alamadavi 71 15,832,980
Create positions sporadic ground sites in Makkah Alzimi 40 27,565,697
Set up by the stopcock Gin Artisan 7 32,326,810
Asphalt pavements and lighting the streets of Mecca and conservative Aljmom Algramoul 34 53,898,450
Improve and beautify the entrances to Makkah Salam 56 12885725
The demolition of the ruins of the buildings and the transfer of business organization objecting sporadic sites Qurashi 224 3999000
Upgrading of roads in Makkah Arafa 98 28,413,000
Connecting roads open to mountain areas in Makkah The FAF 49 24,454,900
Asphalting roads open and mountainous areas in Makkah (third stage) Al-Mutairi 115 17,187,915
Improvement and development of the entrances to Mecca Algoere 200 28,155,000
Asphalt paving and lighting the streets of Mecca (fourth stage) Public Agencies (Jack) 70 31548137
Develop and improve the entrance to Mecca on the one hand Taif Torrent Public Agencies (Jack) 72 9518130
Improve and beautify the entrances to Makkah The Mrtan 4 19282886
Open mountain roads in north and east of Mecca Jameel Aljaid 129 11730000
Asphalting grants schemes in Makkah (fourth stage) Mohammed Saleh Assa'edi 130 17325000
Implementation of the positions Salrlt ground in Makkah (third stage) Travel Sharif 208 16530382
Asphalt paving and lighting the streets of south and west of Mecca process (fifth stage) Al-Mutairi 244 15712192
Open mountainous south and west of Mecca ways Al-Mutairi 245 11791200
Asphalt paving and lighting the streets of the north and east of Mecca (fifth stage) Algramoul 13 15795996